Roads and Footpath Works
Road works are coordinated so as to minimise disruptions to residents, motorists and pedestrians. For example, road works located near residential areas are carried out mostly in the day, and road works near schools and busy roads are scheduled for non-peak hours.
Work on the City’s roads, footpaths and verges can be carried out by a number of different service providers. In general, the City manages the local roads within the local government area and the main, State controlled roads are managed by Main Roads WA.
Roads are condition-rated against a range of criteria to determine the need for, and timing of, preventative or remedial action to prevent loss of service. The ratings address factors such as structure, surface cracking, ride-ability, age and predicted increases in traffic volumes and vehicle classifications.
Current road and footpath news
News Listings
Cycle path crossings create a safer journey
Cyclists are enjoying an easier ride along the South Perth Foreshore after the City installed raised priority crossings at three busy intersections.
Canning Bridge to Curtin Bike Link
The City is seeking feedback on a proposed bike link that will create a safer route between Canning Bridge and Curtin University.
Resurfacing works - Canning Highway, South Perth
Main Roads WA will be conducting resurfacing works on Canning Highway between Berwick Street and South Terrace, South Perth between Tuesday 15 March to Thursday 31 March 2022.
South Perth Foreshore cycle path upgrades
Crossings have been constructed where the bike path intersects with the road at Coode Street, Douglas Avenue and Witcomb Place on South Perth Foreshore.
Foreshore cycle path upgrades
An upgrade to the shared path between Queen Street and Millers Pool is now complete and the path is back open.