Roads and Footpath Works
Road works are coordinated so as to minimise disruptions to residents, motorists and pedestrians. For example, road works located near residential areas are carried out mostly in the day, and road works near schools and busy roads are scheduled for non-peak hours.
Work on the City’s roads, footpaths and verges can be carried out by a number of different service providers. In general, the City manages the local roads within the local government area and the main, State controlled roads are managed by Main Roads WA.
Roads are condition-rated against a range of criteria to determine the need for, and timing of, preventative or remedial action to prevent loss of service. The ratings address factors such as structure, surface cracking, ride-ability, age and predicted increases in traffic volumes and vehicle classifications.
Current road and footpath news
News Listings
Road Rehabilitation Works - Tate St between Angelo St and Swan St
The City is undertaking road rehabilitation works on Tate St between Angelo St and Swan St
Angelo Street bus shelter relocation
The Public Transport Authority will be working on Angelo Street to relocate a bus stop, which was moved during the Coles development.
South Perth Esplanade road works
On Monday 20 March, the City will commence road works along the South Perth Esplanade, to upgrade roads and footpaths and improve safety.
Road Resurfacing Works - Lockhart St between Thelma St and Davilak St
The City is undertaking road resurfacing works on Lockhart St between Thelma St and Davilak St
Road Resurfacing Works - Hobbs Av between Murray St and Blamey Pl
The City is undertaking road resurfacing works on Hobbs Av between Murray St and Blamey Pl