Roads and Footpath Works
Road works are coordinated so as to minimise disruptions to residents, motorists and pedestrians. For example, road works located near residential areas are carried out mostly in the day, and road works near schools and busy roads are scheduled for non-peak hours.
Work on the City’s roads, footpaths and verges can be carried out by a number of different service providers. In general, the City manages the local roads within the local government area and the main, State controlled roads are managed by Main Roads WA.
Roads are condition-rated against a range of criteria to determine the need for, and timing of, preventative or remedial action to prevent loss of service. The ratings address factors such as structure, surface cracking, ride-ability, age and predicted increases in traffic volumes and vehicle classifications.
Current road and footpath news
News Listings
Road Rehabilitation Works - George St, Kensington
The City will be undertaking road rehabilitation works at George Street, between Douglas Avenue and Dyson Street, Kensington. Works have been postponed until 30 May–2 June and 13–14 June 2022.
Weekly approved works 30 May- 5 June 2022
Approved works within the City of South Perth for 30 May- 5 June 2022.
Weekly approved works 23-29 May 2022
Approved works within the City of South Perth for 23-29 May 2022.
Redmond Stairs project underway
Replacement of the Redmond Stairs in Salter Point has begun to provide the community with safer access to this section of a much-loved riverside walk trail.
Weekly approved works 16-22 May 2022
Approved works within the City of South Perth for 16-22 May 2022.