Road crack sealing program

Public Notice 28 September 2018
Road Works

Between November 2018 and January 2018, in accordance with the 2018/19 Capital Works Program, the City of South Perth will complete an annual crack sealing program to stop the ingress of moisture to the pavement below the bitumen surface and prolong the life of existing bitumen roads. The City’s roads have been assessed and a list developed for action.

The process involves the eradication of weeds within the road surface, the high pressure cleaning of debris from within the cracks then application of a hot polymer modified bitumen binder into the cracked surface.

The process will involve short term partial or full road closures.

Residents are asked to take care when driving around these work sites and stay away from freshly treated areas.

 

Contact us

For more information, please contact the City.