Roads and Footpath Works
Road works are coordinated so as to minimise disruptions to residents, motorists and pedestrians. For example, road works located near residential areas are carried out mostly in the day, and road works near schools and busy roads are scheduled for non-peak hours.
Work on the City’s roads, footpaths and verges can be carried out by a number of different service providers. In general, the City manages the local roads within the local government area and the main, State controlled roads are managed by Main Roads WA.
Roads are condition-rated against a range of criteria to determine the need for, and timing of, preventative or remedial action to prevent loss of service. The ratings address factors such as structure, surface cracking, ride-ability, age and predicted increases in traffic volumes and vehicle classifications.
Current road and footpath news
News Listings
Resurfacing works - Canning Highway, South Perth
Main Roads WA will be conducting resurfacing works on Canning Highway between Berwick Street and South Terrace, South Perth between Tuesday 15 March to Thursday 31 March 2022.
Weekly approved works 28 February - 6 March 2022
Approved works within the City of South Perth for 28 February - 6 March 2022.
Weekly approved works 21-27 February 2022
Approved works within the City of South Perth for 21-27 February 2022.
Weekly approved works 14-20 February 2022
Approved works within the City of South Perth for 14-20 February 2022.
South Perth Foreshore cycle path upgrades
Crossings have been constructed where the bike path intersects with the road at Coode Street, Douglas Avenue and Witcomb Place on South Perth Foreshore.