Roads and Footpath Works
Road works are coordinated so as to minimise disruptions to residents, motorists and pedestrians. For example, road works located near residential areas are carried out mostly in the day, and road works near schools and busy roads are scheduled for non-peak hours.
Work on the City’s roads, footpaths and verges can be carried out by a number of different service providers. In general, the City manages the local roads within the local government area and the main, State controlled roads are managed by Main Roads WA.
Roads are condition-rated against a range of criteria to determine the need for, and timing of, preventative or remedial action to prevent loss of service. The ratings address factors such as structure, surface cracking, ride-ability, age and predicted increases in traffic volumes and vehicle classifications.
Current road and footpath news
News Listings
Weekly approved works 8-14 March 2021
Approved works within the City of South Perth for 1-7 March 2021.
Weekly approved works 1-7 March 2021
Approved works within the City of South Perth for 1-7 March 2021.
Weekly approved works 22-28 February 2021
Approved works within the City of South Perth for 22-28 February 2021.
Weekly approved works 15-21 February 2021
Approved works within the City of South Perth for 15-21 February 2021.
Kwinana Freeway northbound shared path and on-ramp closures
Main Roads WA have advised Principal Shared Path and on-ramp closures are planned for asphalt works associated with the Smart Freeway project.