Roads and Footpath Works
Road works are coordinated so as to minimise disruptions to residents, motorists and pedestrians. For example, road works located near residential areas are carried out mostly in the day, and road works near schools and busy roads are scheduled for non-peak hours.
Work on the City’s roads, footpaths and verges can be carried out by a number of different service providers. In general, the City manages the local roads within the local government area and the main, State controlled roads are managed by Main Roads WA.
Roads are condition-rated against a range of criteria to determine the need for, and timing of, preventative or remedial action to prevent loss of service. The ratings address factors such as structure, surface cracking, ride-ability, age and predicted increases in traffic volumes and vehicle classifications.
Current road and footpath news
News Listings
Road works on Edgecumbe Street in Como
The City will be undertaking road rehabilitation works along Edgecumbe Street between Henley Street and the end of the cul de sac, scheduled to start the week commencing 16th January 2017.
Road works on Thelma Street and Hayman Road
From 9 January 2017 the City will be undertaking construction works at the intersection of Thelma Street and Hayman Road.
Half lane closure on Thelma Street from Blamey Place to Hayman Road
The City will be undertaking drainage works along Thelma Street from Blamey Place to Hayman Road from Saturday 3 December.
Road Rehabilitation Works, Lowan Loop in Karawara
From 30 November, the City will be undertaking road rehabilitation works in Karawara along Lowan Loop at both intersections with Walanna Drive.
Road rehabilitation works on Market Street and King Street, Kensington
From 5 December, the City will be undertaking road rehabilitation works along Market Street between Douglas Avenue and Collins Street and along King Street between Market Street and Collins Street in Kensington.