Roads and Footpath Works
Road works are coordinated so as to minimise disruptions to residents, motorists and pedestrians. For example, road works located near residential areas are carried out mostly in the day, and road works near schools and busy roads are scheduled for non-peak hours.
Work on the City’s roads, footpaths and verges can be carried out by a number of different service providers. In general, the City manages the local roads within the local government area and the main, State controlled roads are managed by Main Roads WA.
Roads are condition-rated against a range of criteria to determine the need for, and timing of, preventative or remedial action to prevent loss of service. The ratings address factors such as structure, surface cracking, ride-ability, age and predicted increases in traffic volumes and vehicle classifications.
Current road and footpath news
News Listings
Connect South construction works: 27 May - 10 June 2019
Connect South works commencing Monday 27 May.
Weed Control Treatment
Subject to weather conditions, contract weed control treatments will be carried out on all footpaths, cycle ways, drainage sumps and kerb lines within the City of South Perth from 29 May 2019.
South Perth Station Precinct works: 27 May - 2 June 2019
Approved works within the South Perth Station Precinct for 27 May - 2 June 2019
South Perth Station Precinct works: 20-26 May 2019
Approved works within the South Perth Station Precinct for 20-26 May 2019.
Connect South construction works: 13-26 May 2019
Connect South works commencing Monday 13 May.