Roads and Footpath Works

Road works are coordinated so as to minimise disruptions to residents, motorists and pedestrians. For example, road works located near residential areas are carried out mostly in the day, and road works near schools and busy roads are scheduled for non-peak hours.

Work on the City’s roads, footpaths and verges can be carried out by a number of different service providers. In general, the City manages the local roads within the local government area and the main, State controlled roads are managed by Main Roads WA.

Roads are condition-rated against a range of criteria to determine the need for, and timing of, preventative or remedial action to prevent loss of service. The ratings address factors such as structure, surface cracking, ride-ability, age and predicted increases in traffic volumes and vehicle classifications. 

Report a road maintenance issue

Current road and footpath news

News Listings

June 2019
Detourahead

South Perth Station Precinct works: 24-30 June 2019

Public Notice 25 June 2019

Approved works within the South Perth Station Precinct for 24-30 June 2019

Road Works SPSP Traffic
Detourahead

South Perth Station Precinct works: 17-23 June 2019

Public Notice 14 June 2019

Approved works within the South Perth Station Precinct for 17-23 June 2019

Road Works SPSP Traffic
RoadworkAhead

South Perth Station Precinct works: 10-16 June 2019

Public Notice 12 June 2019

Approved works within the South Perth Station Precinct for 10-16 June 2019

Road Works SPSP Traffic
Concretefootings2

Connect South construction works: 10 - 20 June 2019

News Update 11 June 2019

Connect South works commencing Monday 10 June.

Building works Connect South Maintenance Works Road Works SPSP Traffic
May 2019
RoadworkAhead

South Perth Station Precinct works: 3-9 June 2019

Public Notice 31 May 2019

Approved works within the South Perth Station Precinct for 3-9 June 2019

Road Works SPSP Traffic

Major works and projects