Roads and Footpath Works

Road works are coordinated so as to minimise disruptions to residents, motorists and pedestrians. For example, road works located near residential areas are carried out mostly in the day, and road works near schools and busy roads are scheduled for non-peak hours.

Work on the City’s roads, footpaths and verges can be carried out by a number of different service providers. In general, the City manages the local roads within the local government area and the main, State controlled roads are managed by Main Roads WA.

Roads are condition-rated against a range of criteria to determine the need for, and timing of, preventative or remedial action to prevent loss of service. The ratings address factors such as structure, surface cracking, ride-ability, age and predicted increases in traffic volumes and vehicle classifications. 

Report a road maintenance issue

Current road and footpath news

News Listings

April 2019
Roadworksign

South Perth Station Precinct works: 29 April-5 May 2019

Public Notice 26 April 2019

Approved works within the South Perth Station Precinct for 29 April-5 May 2019.

Road Works SPSP Traffic
CapitalWorksProgramme2

South Perth Station Precinct works: 22-28 April 2019

Public Notice 23 April 2019

Approved works within the South Perth Station Precinct for 22-28 April 2019.

Road Works SPSP Traffic
Roadworkssign

South Perth Station Precinct works: 15-21 April 2019

Public Notice 15 April 2019

Approved works within the South Perth Station Precinct for 15-21 April 2019.

Road Works SPSP Traffic
Roadworkssign

South Perth Station Precinct works: 8-14 April 2019

Public Notice 10 April 2019

Approved works within the South Perth Station Precinct for 8-14 April 2019.

Road Works SPSP Traffic
ConnectSouth

Connect South construction works: 8-21 April 2019

News Update 8 April 2019

Connect South works commencing Monday 8 April.

Building works Connect South Maintenance Works Parks and Reserve works Road Works SPSP Traffic

Major works and projects