Road works are coordinated so as to minimise disruptions to residents, motorists and pedestrians. For example, road works located near residential areas are carried out mostly in the day, and road works near schools and busy roads are scheduled for non-peak hours.
Work on the City’s roads, footpaths and verges can be carried out by a number of different service providers. In general, the City manages the local roads within the local government area and the main, State controlled roads are managed by Main Roads WA.
Roads are condition-rated against a range of criteria to determine the need for, and timing of, preventative or remedial action to prevent loss of service. The ratings address factors such as structure, surface cracking, ride-ability, age and predicted increases in traffic volumes and vehicle classifications.
Current road and footpath news
News Listings
South Perth Station Precinct works update: week commencing 4 September 2017
Approved works within the South Perth Station Precinct for the week commencing 4 September 2017.
South Perth Station Precinct works update: week commencing 28 August 2017
Approved works within the South Perth Station Precinct for the week commencing 28 August 2017.
South Perth Station Precinct works update: week commencing 21 August 2017
Approved works within the South Perth Station Precinct for the week commencing 21 August 2017.
Cale Street Stormwater Drainage Upgrade
Drainage works along Cale Street between Mary Street and Leonora Street, Como will be carried out on the week commencing 28 August 2017.
Night works Mill Point Rd Thursday 17 August
Water Corporation will be undertaking night work on Thursday 17 August, between 8pm to 6am, to install a work zone barrier on Mill Point Road from Onslow Street to the bus stop prior to Mends Street.